Development of the Danube between Straubing (lock) and Bogen (Railway bridge)
Sector: Water Supply and Storage • Location: Germany
Source: EU Funding & Tenders Portal
The project comprises necessary tasks for the development of the German federal waterway Danube between the existing lock Straubing and the railway bridge Bogen. This project is the first part of the global project “Development of the Danube between Straubing and Vilshofen”, intending to improve shipping conditions as well as flood protection. The Danube section between Straubing and Vilshofen in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises necessary tasks for the development of the German federal waterway Danube between the existing lock Straubing and the railway bridge Bogen. This project is the first part of the global project “Development of the Danube between Straubing and Vilshofen”, intending to improve shipping conditions as well as flood protection. The Danube section between Straubing and Vilshofen in Lower Bavaria is the major bottleneck on the whole Trans-European Rhine/Meuse-Main-Danube inland waterway axis in particular with regard to maximum possible draught (the weight-induced submersion depth of a vessel). Based on an EU-funded study (cf. 2007-DE-18050-S: ‘Independent variant research on the development of the Danube between Straubing and Vilshofen, 2013‘) the Federal Government of Germany and the Free State of Bavaria jointly decided to develop the free flowing section from Straubing to Vilshofen according to variant A by implementing solely river regulation measures (i.e. without lock/storage/impounding). Objective of the current project is to increase fairway depth between lock Straubing and railway bridge Bogen by 6.5 dm at a defined low navigable water level (RNW) combining dredging works with riverbed protection measures. Additionally, the port Straubing-Sand will be adapted to the new shipping conditions. The project includes all technical measures, all landscape management measures to compensate the incurred ecological impacts, preparatory and auxiliary works, such as pre-construction engineering, site set-up, surveying works, and the removal of explosive ordnance from World War 2. Main objective of the project is to increase possible ship load due to a raised draught. Furthermore the project will have further beneficial side effects on fairway maintenance, necessary sediment management (less progressive riverbed erosion), and safety and ease of shipping (reduction of nautical difficulties). As a result of the port adaption, both the interoperability and the transport capacity (better adjustment to changing water levels) for this river segment are further increased. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
