logo

Development of the internal water system of common interest on the Mureşel Channel, Ier Connecting Channel and Ier Channel

Sector: Commercial • Location: Hungary

Source: Keep.EU

Project
Closed

The Convention between Romanian and Hungarian Governments from September the 15-th 2003 had already taken into account The Water Framework Directive of the EU. The Convention was signed by both Romanian and Hungarian Governments, with the intention to develop their bilateral cooperation on the protection and sustainable usage of cross-border rivers and water courses, subsurface cross-border aquife

Project Information FAQ

Project Information

5 Q
The project “Development of the internal water system of common interest on the Mureşel Channel, Ier Connecting Channel and Ier Channel” is an infrastructure initiative in the Commercial sector, located in Hungary. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Convention between Romanian and Hungarian Governments from September the 15-th 2003 had already taken into account The Water Framework Directive of the EU. The Convention was signed by both Romanian and Hungarian Governments, with the intention to develop their bilateral cooperation on the protection and sustainable usage of cross-border rivers and water courses, subsurface cross-border aquifer layers, also on the the protection of aquatic ecosystems and on the enviromment protection including to improve water quality. Inland Water Controls Regulations, the 3rd Annex of the Water Convention as of 17th May 2004 regulates the flowing of inland waters developing in river basins divided by boundaries through inland waters draining channels or through valleys or natural depressions, additionally, the management of sluices diverting inland waters and the operation of pump stations. The Regulation, at the same time, determines the values of discharges and water levels according which inland waters developing in the area can flow down through channels crossing boundaries. To ensure undisturbed downflow of pre-defined water discharges, the Regulation provides that all inland water channels, sluices and pumping stations must be maintained and kept in good order. The Regulation also provides for measures and tasks of the competent water authorities/bodies to be taken and fulfilled, respectively.The reabilitation of existing draining capacities represents an important measure for developing of romanian agricol sector. As well, the reabilitation of our three chanels and hydrotechnical constructions and popmping station will lead to elimination of water losses through seepage from the channels, the removal of degradation occurring in the hydrotechnical constructions and reduction of costs for ensuring the operation to the initially design parameters . The current project is proposed by a partnership between ANIF ARAD and Lower Tisa District Water Directorate (ATIVIZIG) in order to tackle common challenges identified in the Cigányka-ér water body ( measurement point of Battonya), in the Romanian and Hungarian cross border area.Investments planned during the project:- Development of an existing pump station for an environmentially-friendly and effective water supply on the Cigányka-ér (0+343) km: purchase of electric pumps and its fittings, development of electric supply- Restoration of the canal bed and its water transport capability for reaching the "good status" of the affected water bodies.- Development of the monitoring system. Construction of an monitoring point on the 0+343 section of "Cigyánka-ér" for adequacy for WDF. Purchase of an ADCP device, which is suitable for measure of water discharge on small rivers.- Purchase of auxiliary fittings for maintenance machines to the long term sustainability of results.Intervention on Romanian side (ANIF Arad) will be focused and concretized on:Improvement of quality of water by investment in hydrotechnical arrangement in Arad county on water channels Muresel, Ier, Ier-BorderReduce the pollution of water on this channels with positive impact on measurement points of Turnu, Pecica Developing of integretated water management of channels in order to mitigate the risk of pollution caused by flood. The project contributes to the objectives of the program in terms of water quality improvement at three measurement points in the ARAD and BEKES cross-border area: Pecica, Turnu, Battonya. To achieve this goal, the two partner organizations in the Project, ANIF (lead partner) and ATIVIZIG – partner- will make a set of investments in water infrastructure in the hydrotechnical developments along 4 segments of the water channels, Mureşel, Ier Legator, Ier and Ţiganca, and will acquire equipment for carrying out water quality monitoring works. The project is the result of the collaboration between the two partners both in the preparation phase and in the implementation with a joint team and a joint budget Joint Preparation: Development of a complex set of investments to meet the challenges posed by the need to intervene in the area to reduce the risk of water pollution generated by the activities of the population living in the area (estimated more the 198.000 peoples) in order to comply with the foreseen common legal framework in bilateral international agreements and EU water framework directives.Joint Implementation: by establishing the principles of an efficient project management under the guidance of the project leader to pursue the proposed investment, allocating material, financial and human resources that will lead to the achievement of the proposed ojectives. Joint project team consist in project manager, assistant manager (2persons) , financial officers (2 persons) , procurement responsible (2 pers) technical specialist (2 persons).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data