logo

Development of Water Supply Project at Dhekiajuli Town, Sonitpur Assam

Sector: Commercial • Location: Sonitpur, Assam, India

Source: India Investment Grid (IIG)

Project
Closed

Information Guwahati Municipal Corporation has come up with Development of Water Supply Project at Dhekiajuli Town, Sonitpur Assam with a ticket size of 46.03 INR Crores. This project in Water Treatment Plants sub-sector involves Water Supply & Distribution Project The current status of the project is Tender Published and is being developed through the EPC route. Economic/Social Impact of the Proj

Project Information FAQ

Project Information

5 Q
The project “Development of Water Supply Project at Dhekiajuli Town, Sonitpur Assam” is an infrastructure initiative in the Commercial sector, located in Sonitpur, Assam, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Guwahati Municipal Corporation has come up with Development of Water Supply Project at Dhekiajuli Town, Sonitpur Assam with a ticket size of 46.03 INR Crores. This project in Water Treatment Plants sub-sector involves Water Supply & Distribution Project The current status of the project is Tender Published and is being developed through the EPC route. Economic/Social Impact of the Project Design, supply of material, construction of Administrative Building. It is single storied building having minimum covered area of 60.00 sqm. It shall be RCC framed structure with doors, windows, ventilators etc. It shall consist of office space, spare parts storage area and toilets. Potable water tank shall be provided on the roof. All sanitary fittings shall be installed in the toilets. RCC, The Clear Water Rising and distribution lines will be laid as per scope of work & alignment drawing.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data