logo

Development phase for project 1.7.1 Interconnection between Navarra (ES) and Landes (FR)

Sector: Aerospace & Defense • Location: Spain, France

Source: EU Funding & Tenders Portal

Project
Ongoing

The Project contributes to the implementation of PCI 1.7.1. Interconnection between Navarra (ES) and Landes (FR), also known as “Pyrenean crossing 1”, which is a new interconnection of 225 km HDVC line of 2 GW transfer capacity between France and Spain. The Project aims to prepare technical and financial studies for the new HDVC cable between Spain and France and two new converter stations, one in

Project Information FAQ

Project Information

3 Q
The project “Development phase for project 1.7.1 Interconnection between Navarra (ES) and Landes (FR)” is an infrastructure initiative in the Aerospace & Defense sector, located in Spain, France. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project contributes to the implementation of PCI 1.7.1. Interconnection between Navarra (ES) and Landes (FR), also known as “Pyrenean crossing 1”, which is a new interconnection of 225 km HDVC line of 2 GW transfer capacity between France and Spain. The Project aims to prepare technical and financial studies for the new HDVC cable between Spain and France and two new converter stations, one in Spain and another in France. The Project includes carrying out the feasibility and design studies, the assessment of the best possible routes and locations, economic analysis, preparing and submitting the documentation for permitting and preparing the EPC procurement processes. The Project will be carried out by internal and external resources. The main deliverables are: - Cable feasibility report among the routing in Spain and France completed; - Selection of the cable EPC contractor prepared; - Converter station feasibility report for Spain and France completed; - Selection of the converter station EPC contractor prepared; - Permitting application submitted to the competent Spanish and French authorities; - Report on the status of permitting completed; - Economic analysis report completed. Once the Project is completed, the PCI will be ready to enter the construction phase.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data