logo

Devils Glen Road Widening Phase 2

Sector: Water Supply and Storage • Location: Bettendorf, Iowa, United States of America

Source: Dodge

Project
Closed

The proposed improvements will consist of widening approximately 4107 lineal feet of nine (9 ) inch Portland Cement Concrete (PCC) pavement on a drainable subbase with subdrains from the existing 2 lane corridor to 4 lanes with turn lanes on Devils Glen Road from Crow Lake Drive to Crow Lake Drive. There will also be a five (5 ) foot wide sidewalk added on the west side of Devils Glen Road for the

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Road, Car parking, Bridge, Commercial, Waste Processing and Treatment, Automotive
Location
Bettendorf, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Devils Glen Road Widening Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Devils Glen Road Widening Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Bettendorf, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed improvements will consist of widening approximately 4107 lineal feet of nine (9 ) inch Portland Cement Concrete (PCC) pavement on a drainable subbase with subdrains from the existing 2 lane corridor to 4 lanes with turn lanes on Devils Glen Road from Crow Lake Drive to Crow Lake Drive. There will also be a five (5 ) foot wide sidewalk added on the west side of Devils Glen Road for the pedestrian connection between 53rd Avenue to north of the bridge over Crow Creek. Also included ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Bettendorf

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Road, Car parking, Bridge, Commercial, Waste Processing and Treatment, Automotive

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project