logo

Devoll River Hydro power plants

Sector: Automotive • Location: Albania

Source: World Bank Group

Project
Active

On December 19, 2008 the Government of Albania signed an agreement with the 50-50 Austrian-Norwegian joint venture consisting of the Austrian regional power producer and distributor EVN AG and the Norwegian renewable energy company Statkraft AS to build and operate three Albanian power plants on the Devoli River in the south of Albania.

EVN was awarded a 35-year build-operate-transfer concession

Project Information FAQ

Project Information

5 Q
The project “Devoll River Hydro power plants” is an infrastructure initiative in the Automotive sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On December 19, 2008 the Government of Albania signed an agreement with the 50-50 Austrian-Norwegian joint venture consisting of the Austrian regional power producer and distributor EVN AG and the Norwegian renewable energy company Statkraft AS to build and operate three Albanian power plants on the Devoli River in the south of Albania. EVN was awarded a 35-year build-operate-transfer concession for the projects by the Albanian government in January 2008 after winning an international tender for the rights to exploit the river's hydropower resources and its tributaries. Albania opened a tender for granting a BOT concession in July, 2007. Other bidders included the Turkish steel group Kurum Holding in a consortium with Iceland-based electricity company Landsvirkjun. EVN and Statkraft, each would have a 50% stake in Devoll Hydropower Holding, a special-purpose vehicle established to carry out the concession to build, operate, and transfer the HPPs. The HPPs on the Devoll River would be constructed over a period of eight years at a cost estimated at 950 million euro (US$1.37 billion) and would have a total generating capacity of 340MW. The three HPPs include completion of construction of a partially built facility in Banja, as well as new plants at Lozhane-Grabove and Skanderbegas. At that time, the hydropower concession for the Devoll River was the second to be signed by Albania with an international partner and the second for EVN. In September 2008, the Austrian utility in partnership with compatriots Verbund signed a 35-year concession agreement with Albania's Minister of Economy, Trade and Energy to build and operate the 48-MW Ashta hydropower plant on the Drin River in northern Albania. In December 2012, the project received an infrastructure permit for the construction of three plants from Albania's National Zoning Council, for the $1.06 billion 319MW project. Mott MacDonald (UK) and Coyne et Bellier (FR) were appointed as engineering consultants. The Corporate Wire, Albanian Zoning Authority Issues Permit for Devoll Hydro Project, 21 December 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data