DFC IV
One of 7,540 projects Taiyo tracks in Kenya.
Source: World Bank Group
The proposed project would consist of a line of credit of US$30.0 million of Bank funds to cover part of IDB's foreign exchange requirements finance medium and large scale enterprises from mid 1980 to end 1982. The free limit for a subproject would be raised from US$600,000 to US$800,000 (similar, in real terms,for the previous loans) and the aggregate free limit to US$7.0 million. Disbursements f
- Status
- Closed
- Sector
- Manufacturing (Industrial), Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DFC IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project would consist of a line of credit of US$30.0 million of Bank funds to cover part of IDB's foreign exchange requirements finance medium and large scale enterprises from mid 1980 to end 1982. The free limit for a subproject would be raised from US$600,000 to US$800,000 (similar, in real terms,for the previous loans) and the aggregate free limit to US$7.0 million. Disbursements from the Bank's loan would be made against 100% of the foreign cost of direct imports, 65% of the invoice price of goods previously imported into Kenya and 40% of the cost of civil works. IDB would be charging an interest rate of no less than 12% on foreign funds (from 11%), and 13% on local funds (from 12%). Sub-borrowers will continue to bear the foreign exchange risk on foreign funds. The loan would carry an interest rate of 8.25% per annum and the amortization schedule would conform substantially to the aggregate of the amortization schedules of subloans and equity investments made by IDB, with a maximum maturity of 15 years, including a grace period of three years. |
Original sector | Financial Sector |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Kenya
- Lake Turkana Wind Power Project Loyangalani
- Acquisition of equipment and Facilities for expansion of hospitality project
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- Expansion plan for introducing ready to drink fortified porridge
- Development and Capacity Building of Sargasso Industries
- Manufacture of Rapid Diagnostic Test Kits
- SOLAR POWER GENERATION PROJECT
