DFF - Altintel Port Expansion
Repaying · Türkiye
Source: European Bank for Reconstruction and Development (EBRD)
A senior loan of up to USD 8.5 million in favour of Altintel Liman ve Terminal Isletmeleri A.S. ("Altintel Port", the "Borrower", or the "Port"), a liquid bulk port located in Kocaeli Province in the Marmara region of Turkey. The Bank's investment will be used to finance the Port's expansion through construction and installation of 18 chemical storage tanks and related infrastructure with a modern
- Status
- Under Construction
- Sector
- Advanced Electronics, Natural Gas, Chemical (Industrial), Warehouse, Raw Materials, Manufacturing (Industrial), Residential, Oil and Gas, Automotive, Commercial, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about DFF - Altintel Port Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A senior loan of up to USD 8.5 million in favour of Altintel Liman ve Terminal Isletmeleri A.S. ("Altintel Port", the "Borrower", or the "Port"), a liquid bulk port located in Kocaeli Province in the Marmara region of Turkey. The Bank's investment will be used to finance the Port's expansion through construction and installation of 18 chemical storage tanks and related infrastructure with a modern sensor system (the "Project"). The expansion results in an increase of the Port's total liquid bulk capacity by 23,164 m3 to 105,600 m3. The new facilities are not associated with fossil fuels and are used for the handling and storage of petrochemicals and base oil, which are raw materials for consumer goods, paint and coating, pharmaceuticals, agriculture, construction, electronics and automotive industries. The Project employs a high level of automation and digitalisation technologies through a modern sensor system, which enhance: (i) energy, cost savings, and GHG reduction; (ii) safety; and (iii) business operations. The Project also includes advanced systems and good use of smart technology in: (i) tank stock management; (ii) flow control to/from the jetty; (iii) truck loading bays; (iv) drumming facility; and (v) pumping system. Therefore, the Project is a good example in Turkey of a mid-size business adopting technologies that go beyond the regulatory requirements and country practice. The Project is expected to contribute positively to Altintel Port's decarbonisation by implementing the latest technological and operational improvements. The Project is aligned with Paris Agreement on both mitigation and adaptation. The GET share of the Project is 17%, implying GET-eligible ABI of USD 1.445 million. The Project contributes to emissions reduction due to the fuel shift from fuel oil to natural gas, using electric equipment, inverter pumps and LED lighting. By phasing out fuel oil consumption in the Port's heating system, the Project will also result in reduction of pollutant emissions. |
Original sector | Transport |
Budget |
Location
Country | Turkey |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Natural Gas, Chemical (Industrial), Warehouse, Raw Materials, Manufacturing (Industrial), Residential, Oil and Gas, Automotive, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Advanced Electronics projects in Türkiye
- DFF - Kredim
- DFF - Param
- Novel Calculation and Analysis Method, Planning and Application Platform That Personalizes the Mathematical Definition of Spinal Alignment and Shape (GAP Simulator)
- Transient micromachined pressure-monitoring implants for chronic brain disorders
- Identification of Multidrug Resistance for Chemotherapy Guidance in Cancer Using a Lab-on-a-chip Platform
- DFF - Kredim
- DFF - Param
- European Digital Innovation Hub-Anadolu
