DFF - Stax Technologies
Sector: Manufacturing (Industrial) • Location: Serbia
Source: European Bank for Reconstruction and Development (EBRD)
The proposed Project includes construction of new production facilities and procurement of new production lines (assembly plant, machining workshop, material cutting plant and a paint-shop). In addition, the Company will build a 300KW rooftop solar power plant, planned for the second half of 2022. The investment will effectively increase the capacity of Stax Technologies by over 70%, and will impr
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Solar, Forest Products and Packaging, Education, Commercial, Residential
- Location
- Serbia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about DFF - Stax Technologies
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Project includes construction of new production facilities and procurement of new production lines (assembly plant, machining workshop, material cutting plant and a paint-shop). In addition, the Company will build a 300KW rooftop solar power plant, planned for the second half of 2022. The investment will effectively increase the capacity of Stax Technologies by over 70%, and will improve energy efficiency and productivity through partial replacement of existing equipment and machinery. The new plant will be a virtual replica of the existing one, but will operate the latest state-of-the-art equipment, with much higher efficiency. The new production buildings are designed to achieve Energy Performance Certificate of Class B which is above the national requirement. |
Original sector | Manufacturing and Services |
Budget |
Location
Country | Serbia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Solar, Forest Products and Packaging, Education, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
