DFF Adriatic Metals
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD has subscribed to 2.6 percent of the share capital of Adriatic Metals PLC with an investment of GBP 6.2 million (EUR 6.84 million). The Bank's financing supported the company to transition its operation from exploration to mine development. The proceeds from the Bank's equity subscription are funding engineering and economic studies to complete a Bankable Feasibility Study (BFS) and assoc
- Status
- Under Construction
- Sector
- Road, Government, Rail, Residential, Commercial
- Location
- Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about DFF Adriatic Metals
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD has subscribed to 2.6 percent of the share capital of Adriatic Metals PLC with an investment of GBP 6.2 million (EUR 6.84 million). The Bank's financing supported the company to transition its operation from exploration to mine development. The proceeds from the Bank's equity subscription are funding engineering and economic studies to complete a Bankable Feasibility Study (BFS) and associated pre-development cost for the Vareš mining project. As a condition of EBRD’s equity subscription, Adriatic Metals is required to prepare and disclose an Environmental and Social Impact Assessment (ESIA) in line with EBRD’s Performance Requirements for the Vareš mining project. ERBD is not providing financing for the development of the Vareš mining project but is monitoring its development as part of its equity shareholding in Adriatic Metals. 1. Non-Technical Summary (NTS): English | Bosnian 2. Stakeholder Engagement Plan: English | Bosnian 3. Environmental and Social Impact Assessment (ESIA): English | Bosnian 4. Environmental and Social Management Plans (ESMP): English | Bosnian Full ESIA documentation is available at: Environmental or social enquiries Adriatic Metals/Eastern Mining Contact person: Vildana Mahmutović Address: Eastern Mining d.o.o., Tisovci bb, Vareš Telephone: +387 62 922 215 Email: infocentar@adriaticmetals.com Web: https://www.adriaticmetals.com | https://www.easternmining.ba General enquiries Contact Name: Dominic Roberts Address: Adriatic Metals PLC, Regent House, 65 Rodney Road, Cheltenham, GL501HX, United Kingdom Email: dominic.roberts ’at’ adriaticmetals.com Web: https://www.adriaticmetals.com/ This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure. Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD. Last updated 25 June 2014 |
Original sector | Natural Resources |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Rail, Residential, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
