logo

Dhaka Airport-Gazipur Bus Rapid Transit (BRT) Project

The owner, status and timeline of this project. A free account opens every field.

Source: Daily Bonik Barta

Project
97% Complete, Pending Cabinet Decision On Future

The project was launched in 2012 to connect Dhaka airport with Gazipur via a dedicated bus rapid transit corridor. It aimed to provide congestion-free travel similar to a metro rail system. The project has absorbed BDT 42.5 billion and 97% of the work is complete. However, design complications have led experts and committees to recommend scrapping the BRT system and opening the corridor to all veh

Status
Under Construction
Sector
Airport, Mass Transit, Bridge, Education, Rail, Automotive, Road
Location
Dhaka, Gazipur, Bangladesh
Updated
22 Jul 2026
Source
Daily Bonik Barta

ConstructChat

Ask ConstructChat about Dhaka Airport-Gazipur Bus Rapid Transit (BRT) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dhaka Airport-Gazipur Bus Rapid Transit (BRT) Project” is an infrastructure initiative in the Airport sector, located in Dhaka, Gazipur, Bangladesh. Taiyo aggregates data on it from Daily Bonik Barta.

Participants

Not available for this record.

Status

Original status

97% complete, pending cabinet decision on future

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project was launched in 2012 to connect Dhaka airport with Gazipur via a dedicated bus rapid transit corridor. It aimed to provide congestion-free travel similar to a metro rail system. The project has absorbed BDT 42.5 billion and 97% of the work is complete. However, design complications have led experts and committees to recommend scrapping the BRT system and opening the corridor to all vehicles with toll collection to recover costs.

Original sector

Transport

Budget

Location

Country

Bangladesh

City

Dhaka, Gazipur

Source

Source

Daily Bonik Barta

URL

More Details

Record type

Project

Sector

Airport, Mass Transit, Bridge, Education, Rail, Automotive, Road

Article published date

2026-05-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project