Dhaka Mass Rapid Transit Development Project (Line-5)
Sector: Road • Location: Dhaka, Bangladesh
Source: InfraPPPWorld
This project involves the development of a 17.4 km Metro Line 5 South in Dhaka, Bangladesh.The 4.6 km long Aftabnagar Center-Balirpar section will have an elevated line, while the 12.8 km long Gabtoli-Aftabnagar West section will be constructed underground. The metro line will have 14 stations and carry nearly 1 million passengers each day.
- Status
- Closed
- Sector
- Road, Rail, Mass Transit, Government
- Location
- Dhaka, Bangladesh
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Dhaka Mass Rapid Transit Development Project (Line-5)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the development of a 17.4 km Metro Line 5 South in Dhaka, Bangladesh.The 4.6 km long Aftabnagar Center-Balirpar section will have an elevated line, while the 12.8 km long Gabtoli-Aftabnagar West section will be constructed underground. The metro line will have 14 stations and carry nearly 1 million passengers each day. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Bangladesh |
State | Dhaka |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Mass Transit, Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
