logo
ProjectPipeline

Dhaka MRT Development (Line-2) and Institutional Strengthening

Sector: Mass Transit • Location: Bangladesh

Source: World Bank Group

The proposed Dhaka Metro Line-2 initiative aims to establish a climate-resilient, inclusive, and high-impact urban transport solution for Dhaka through a Multi-phase Programmatic Approach (MPA). The Program will focus on both the construction of a new mass transit line—spanning approximately 23.5 kilometers with elevated and underground sections—and institutional strengthening of the Dhaka Mass Tr

Status
Prospective
Sector
Mass Transit, Road, Power Transmission, Residential, Government, Power Generation (CCGT), Commercial
Location
Bangladesh
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dhaka MRT Development (Line-2) and Institutional Strengthening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dhaka MRT Development (Line-2) and Institutional Strengthening” is an infrastructure initiative in the Mass Transit sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed Dhaka Metro Line-2 initiative aims to establish a climate-resilient, inclusive, and high-impact urban transport solution for Dhaka through a Multi-phase Programmatic Approach (MPA). The Program will focus on both the construction of a new mass transit line—spanning approximately 23.5 kilometers with elevated and underground sections—and institutional strengthening of the Dhaka Mass Transit Company Limited (DMTCL). The first phase of this MPA aims to facilitate the technical, financial, and institutional groundwork required for the successful delivery of a mass rapid transit system that is resilient to climate risks and attractive to private investment.The project is structured around three key components:• Component 1: Feasibility Study, Detailed Design, and Bidding Documents Preparation. This component (estimated cost: USD55-60 million) supports the comprehensive technical and financial preparation for Dhaka MRT Line-2. Activities include a full feasibility study, detailed engineering and design (covering route alignment, station architecture, utility plans), traffic and ridership modeling, and the preparation of procurement strategies and tender documents. Integrated within this process are environmental and social assessments, climate and disaster risk analyses, and development of a robust financing strategy, incorporating mechanisms such as Transit-Oriented Development (TOD), Land Value Capture (LVC), and revenue securitization.• Component 2: Institutional Strengthening and Financing Strategy. With an estimated cost of USD5-10 million, this component aims to enhance DMTCL’s institutional capacity for metro planning, implementation, and operation. Key activities include creating a governance and operational roadmap, targeted capacity-building and training for staff, knowledge-sharing through workshops and international study tours, and development of a comprehensive funding and financing plan. This will cover farebox and real estate revenue, donor funding, PPP structuring, and accessing climate-linked financial instruments.• Component 3: Contingent Emergency Response (CERC). This component establishes a dedicated mechanism for rapid mobilization and response in case of urgent needs or emergencies, ensuring project adaptability and resilience.Overall, the initiative aims for technical excellence, institutional resilience, and sustainable financing to underpin the creation of a modern, inclusive, and climate-resilient urban transit network in Dhaka.

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Power Transmission, Residential, Government, Power Generation (CCGT), Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project