logo

Dhonithanda Wind Project Limited

Sector: Steel • Location: India

Source: World Bank Group

Project
Active

Dhonithanda Wind Project Limited was created to build and operate a 25.5 MW wind park with 17 turbines and 12km of high-voltage power lines to connect the wind park to the mains supply in Gadag District, Karnataka. Dhonithanda Wind Project Limited was a subsidiary of Bhoruka Power Corp (BPCL), the project sponsor.

There was not public information on the total cost of the project. In Febraury 201

Status
Prospective
Sector
Steel, Car parking, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Power Transmission, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dhonithanda Wind Project Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dhonithanda Wind Project Limited” is an infrastructure initiative in the Steel sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Dhonithanda Wind Project Limited was created to build and operate a 25.5 MW wind park with 17 turbines and 12km of high-voltage power lines to connect the wind park to the mains supply in Gadag District, Karnataka. Dhonithanda Wind Project Limited was a subsidiary of Bhoruka Power Corp (BPCL), the project sponsor. There was not public information on the total cost of the project. In Febraury 2010 the project sponsor raised a €19.6m (US$26 million) debt facility to the project of which DEG provided €8.3m and Proparco €7m. Axis Bank, the local commercial bank, extended €4.3m equivalent in rupees. According to a statement, DEG and Proparco participated in the project because is promotes renewable energy, thus contributing to climate protection. Project construction started in Jan 2010 and power plant was slated for commissioning in September 2010.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Car parking, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Power Transmission, Automotive, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project