Diablo Road Trail Crossing Improvements
Sector: Water Supply and Storage • Location: Danville, California, United States of America
Source: Dodge
These bids shall cover all the furnishing of all labor, material, equipment, mechanical workmanship, transportation and services which are required for Diablo Road Pedestrian Trail and Drainage Improvements Project, Contract No. C-055. The work generally includes, but is not limited to, removal of trees, minor regrading, construction of a pedestrian/cycle trail, installation of hot mix asphalt, co
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Car parking, Automotive, Waste Processing and Treatment, Cement, Government
- Location
- Danville, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Diablo Road Trail Crossing Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | These bids shall cover all the furnishing of all labor, material, equipment, mechanical workmanship, transportation and services which are required for Diablo Road Pedestrian Trail and Drainage Improvements Project, Contract No. C-055. The work generally includes, but is not limited to, removal of trees, minor regrading, construction of a pedestrian/cycle trail, installation of hot mix asphalt, construction of drainage improvements including concrete vditches, drainage pipes, and inlets, inst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Danville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Car parking, Automotive, Waste Processing and Treatment, Cement, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
