logo
ProjectCompleted

Diadema III

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

Compañías Asociadas Petroleras S.A. (“CAPSA” or the “Company”) is a small Argentine oil producer which operates 7 fields in the Comodoro Rivadavia region (part of the San Jorge basin). CAPSA which currently produces 1,660 m3/day (eq. to 10,500 bbl/day) has demonstrated expertise in the development of mature oil fields through the reliance on secondary recovery waterflood techniques.

IFC has been

Status
Closed
Sector
Oil and Gas, Government
Location
Argentina
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Diadema III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Diadema III” is an infrastructure initiative in the Oil and Gas sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Compañías Asociadas Petroleras S.A. (“CAPSA” or the “Company”) is a small Argentine oil producer which operates 7 fields in the Comodoro Rivadavia region (part of the San Jorge basin). CAPSA which currently produces 1,660 m3/day (eq. to 10,500 bbl/day) has demonstrated expertise in the development of mature oil fields through the reliance on secondary recovery waterflood techniques. IFC has been requested by CAPSA to provide a corporate loan (the “Facility”) of up to $60 million to finance the Company’s capital expenditure program and refinance some of its term debt into longer tenors not currently available in the market (the “Project”). IFC expects to mobilize 50% (up to $30 million) of the Facility through the B loan program and/or from other funding sources on a parallel basis. As part of its strategy to sustain the production of its mature fields, CAPSA will be undertaking flood efficiency techniques through polymer injection, the drilling of infill wells and the drilling of advanced wells. The Company had already initiated in 2007 a pilot program for polymer injection which proved successful and intends now to go full scale. The polymer and the drilling of infill wells investment is estimated to cost $35 million while capital expenditures for advanced wells are estimated at $19 million. Part of the investment program includes CAPSA’s refinancing of its debt with Deutsche Bank of $17.5 million which is being repaid between now and December 2011. The refinancing will enable the Company to free up cashflows to undertake the flood efficiency projects.

Original sector

AB - Oil and Gas Production (Includes Development)

Location

Country

Argentina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Oil and Gas, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project