logo

Diadema III

Sector: Oil and Gas • Location: Argentina

Source: International Finance Corporation (IFC)

Project
Completed

Compañías Asociadas Petroleras S.A. (“CAPSA” or the “Company”) is a small Argentine oil producer which operates 7 fields in the Comodoro Rivadavia region (part of the San Jorge basin). CAPSA which currently produces 1,660 m3/day (eq. to 10,500 bbl/day) has demonstrated expertise in the development of mature oil fields through the reliance on secondary recovery waterflood techniques.

IFC has been

Project Information FAQ

Project Information

4 Q
The project “Diadema III” is an infrastructure initiative in the Oil and Gas sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Compañías Asociadas Petroleras S.A. (“CAPSA” or the “Company”) is a small Argentine oil producer which operates 7 fields in the Comodoro Rivadavia region (part of the San Jorge basin). CAPSA which currently produces 1,660 m3/day (eq. to 10,500 bbl/day) has demonstrated expertise in the development of mature oil fields through the reliance on secondary recovery waterflood techniques. IFC has been requested by CAPSA to provide a corporate loan (the “Facility”) of up to $60 million to finance the Company’s capital expenditure program and refinance some of its term debt into longer tenors not currently available in the market (the “Project”). IFC expects to mobilize 50% (up to $30 million) of the Facility through the B loan program and/or from other funding sources on a parallel basis. As part of its strategy to sustain the production of its mature fields, CAPSA will be undertaking flood efficiency techniques through polymer injection, the drilling of infill wells and the drilling of advanced wells. The Company had already initiated in 2007 a pilot program for polymer injection which proved successful and intends now to go full scale. The polymer and the drilling of infill wells investment is estimated to cost $35 million while capital expenditures for advanced wells are estimated at $19 million. Part of the investment program includes CAPSA’s refinancing of its debt with Deutsche Bank of $17.5 million which is being repaid between now and December 2011. The refinancing will enable the Company to free up cashflows to undertake the flood efficiency projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data