Dialum Glass Headquarters & Advanced Processing Facility
Closed · Florida · Last reported Aug 2024
Source: Dodge USA
New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes.
- Status
- Closed
- Sector
- Metal, Steel, Commercial, Cement, Power Generation (CCGT), Manufacturing (Industrial), Residential, Bridge
- Location
- Ave Maria, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dialum Glass Headquarters & Advanced Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Ave Maria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Commercial, Cement, Power Generation (CCGT), Manufacturing (Industrial), Residential, Bridge |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
