Dialum Glass Headquarters & Advanced Processing Facility
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes.
- Status
- Closed
- Sector
- Cement, Manufacturing (Industrial), Commercial, Steel, Metal, Bridge, Residential, Power Generation (CCGT)
- Location
- Ave Maria, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dialum Glass Headquarters & Advanced Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Ave Maria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Commercial, Steel, Metal, Bridge, Residential, Power Generation (CCGT) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
