logo
ProjectBid Results, Design Development

Dialum Glass Headquarters & Advanced Processing Facility

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge USA

New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes.

Status
Closed
Sector
Cement, Manufacturing (Industrial), Commercial, Steel, Metal, Bridge, Residential, Power Generation (CCGT)
Location
Ave Maria, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Dialum Glass Headquarters & Advanced Processing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dialum Glass Headquarters & Advanced Processing Facility” is an infrastructure initiative in the Cement sector, located in Ave Maria, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results, Design Development

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Ave Maria

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Manufacturing (Industrial), Commercial, Steel, Metal, Bridge, Residential, Power Generation (CCGT)

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project