Dialum Glass HQ & Advanced Processing Facility REBID
Sector: Bridge • Location: Ave Maria, Florida, United States of America
Source: Dodge
New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes.
- Status
- Closed
- Sector
- Bridge, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Steel, Cement, Metal
- Location
- Ave Maria, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dialum Glass HQ & Advanced Processing Facility REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New 99,108 sq ft glass manufacturing facility to be built at Ave Mari, Fl. The structure will be concrete tilt-wall with a structural steel roof framing and metal deck roof system, there will be two bridge cranes along with administration offices and locker rooms. Fire sprinkler, plumbing, HVAC and electrical along with interior and exterior finishes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Ave Maria |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Bridge, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Steel, Cement, Metal |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
