logo

Diamond Heights Water Main Replacement

Sector: Metal • Location: San Franscisco, California, United States of America

Source: SF Water Power System

Project
Construction

This project will replace pipes that are approaching the end of their useful life. The project will install 16-, 12-, and 8-Inch ductile iron water mains in two areas:In the west at Portola Drive from 200 feet west of Clipper Street to 200 feet east of Clipper Street, Clipper Street from Portola Drive to Diamond Heights Boulevard, Diamond Heights Boulevard from Clipper Street to Duncan Street andI

Project Information FAQ

Project Information

4 Q
The project “Diamond Heights Water Main Replacement” is an infrastructure initiative in the Metal sector, located in San Franscisco, California, United States of America. Taiyo aggregates data on it from SF Water Power System.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will replace pipes that are approaching the end of their useful life. The project will install 16-, 12-, and 8-Inch ductile iron water mains in two areas:In the west at Portola Drive from 200 feet west of Clipper Street to 200 feet east of Clipper Street, Clipper Street from Portola Drive to Diamond Heights Boulevard, Diamond Heights Boulevard from Clipper Street to Duncan Street andIn the east on Diamond Street from 27th Street to Diamond Heights Boulevard, 28th and Duncan streets from Douglass to Noe streets, Valley Street from Diamond to Noe streets, and Noe Street from Duncan to Valley streets.Construction Look AheadWeek of June 3rd Grinding and repaving streets:6/3 - Grind Diamond Street between Diamond Heights Boulevard to Valley Street intersection6/4 - Pave Diamond Street between Valley and 29th streets intersection6/5 - Pave Diamond Street between 29th Street and Diamond Heights Boulevard6/6 - Grind and pave Clipper Street between Portola Drive and Diamond Heights Boulevard

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data