Dibamba
Sector: Water Supply and Storage • Location: Cameroon
Source: International Finance Corporation (IFC)
KPDC is developing 86 MW Heavy Fuel Oil (“HFO”)-fired diesel engine power plant (Dibamba), located at Yassa village about 15 km from Douala, and a new 2 km 90 kV transmission line from the Dibamba plant to the existing Ngodi Bakoko substation. The Dibamba plant may be converted to gas-fired if natural gas becomes available. Sonel will also be the off-taker of the power produced by KPDC. The Proj
- Status
- Closed
- Sector
- Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Geothermal, Natural Gas, Power Transmission, Manufacturing (Industrial), Metal, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Dibamba
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | KPDC is developing 86 MW Heavy Fuel Oil (“HFO”)-fired diesel engine power plant (Dibamba), located at Yassa village about 15 km from Douala, and a new 2 km 90 kV transmission line from the Dibamba plant to the existing Ngodi Bakoko substation. The Dibamba plant may be converted to gas-fired if natural gas becomes available. Sonel will also be the off-taker of the power produced by KPDC. The Project will be Cameroon’s first Independent Power Project (IPP). Dibamba will be an emergency thermal power plant to avoid major load-shedding. Construction works of the Dibamba plant is completed and testing has been performed. Site clearing activities and revegetation are being undertaken. The Dibamba Project objectives are to provide peaking and reserve capacity in electricity generation, in order to meet the growing public sector electricity demand and industrial expansion. The project will help avoid load shedding during the dry season (which typically lasts from January to June each year). |
Original sector | AC - Heavy Fuel Oil - Thermal Power Generation |
Location
Country | Cameroon |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Geothermal, Natural Gas, Power Transmission, Manufacturing (Industrial), Metal, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cameroon
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Cameroon - Lom-Pangar Hydroelectric Project
- Nachtigal hydropower plant
- Kribi Container Terminal
- Cameroon - Agricultural Value Chain Development Project
- CAMWATER
- Douala Container Terminal
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
