logo
ProjectUnder Implementation

Dibang Multipurpose Project

Under implementation · Arunachal Pradesh

Source: India Investment Grid (IIG)

Information NHPC has come up with Dibang Multipurpose Project with a ticket size of 31876.39 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project 2880 MW, Dibang Project is a multipurpose project with Flood Moderation as key objective. The project is

Status
Prospective
Sector
Airport, Hydro, Tunnel, Cement, Power Generation (CCGT), Road, Government, Water Supply and Storage, Solar, Biomass, Wind
Location
Lower Dibang Valley, Arunachal Pradesh, India
Updated
19 Nov 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Dibang Multipurpose Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dibang Multipurpose Project” is an infrastructure initiative in the Airport sector, located in Lower Dibang Valley, Arunachal Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

under implementation

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Information NHPC has come up with Dibang Multipurpose Project with a ticket size of 31876.39 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project 2880 MW, Dibang Project is a multipurpose project with Flood Moderation as key objective. The project is located in Lower Dibang Dist. of Arunachal Pradesh. The nearest railhead & airport is Tinsukia / Dibrugarh and Dibrugarh respectively. The project envisages construction of following main components: 278 m high and 798 m long Concrete Gravity dam nos. Head Race Tunnels of 300m to 600m length Underground Power House housing 12 units of 240 MW each The Project is designed to generate 11223 Mus per annum. Project is scheduled to be completed in 108 months from the date of sanction by the Govt. of India.

Original sector

Electricity Generation

Procurement method

Budget

Location

Country

India

State

Arunachal Pradesh

City

Lower Dibang Valley

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Airport, Hydro, Tunnel, Cement, Power Generation (CCGT), Road, Government, Water Supply and Storage, Solar, Biomass, Wind

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project