logo

Diboll relief route

Sector: Road • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project
Implementation

This project is dedicated to improving safety and mobility on US 59 near the city of Diboll. Studies for the Diboll Relief Route began in the 1990’s and concluded with TxDOT receiving approval of the schematic and environmental studies in 1999. TxDOT soon began purchasing right of way; however, due to budgetary constraints, ROW acquisitions were stopped. Development of the Diboll Relief Route was

Project Information FAQ

Project Information

5 Q
The project “Diboll relief route” is an infrastructure initiative in the Road sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is dedicated to improving safety and mobility on US 59 near the city of Diboll. Studies for the Diboll Relief Route began in the 1990’s and concluded with TxDOT receiving approval of the schematic and environmental studies in 1999. TxDOT soon began purchasing right of way; however, due to budgetary constraints, ROW acquisitions were stopped. Development of the Diboll Relief Route was revived after being identified as the top priority of I-69 development in Angelina County by the I-69 Angelina and Nacogdoches Counties Committee in 2013. TxDOT held an open house on Jan. 22, 2015, to display the schematic that had been updated to meet current interstate standards and to gather information and comments from the public. After the open house, TxDOT compiled the comments and made further revisions to the schematic to address comments. Some of those changes included lengthening several ramps to provide access to landlocked parcels, reconfiguring the south interchange to a more conventional diamond interchange and providing a city street connection from Old Diboll Highway to the FM 2108 Interchange.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data