logo

Dich Vong Hau Kindergarten / Sunjin Vietnam Joint Venture Company

Sector: Education • Location: Vietnam

Source: ArchDaily

Project
Closed

With the philosophy of "students as the center," the proposed idea was to keep the existing building structure and use the steel frame structure covered with plastic wood on the rooftop to increase the height to 3 floors. Additionally, to build 2 new 4-story blocks on the west side. This new and old mixed-use solution creates a playground core that is not only safe but also acts as a large skyligh

Project Information FAQ

Project Information

3 Q
The project “Dich Vong Hau Kindergarten / Sunjin Vietnam Joint Venture Company” is an infrastructure initiative in the Education sector, located in Vietnam. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

With the philosophy of "students as the center," the proposed idea was to keep the existing building structure and use the steel frame structure covered with plastic wood on the rooftop to increase the height to 3 floors. Additionally, to build 2 new 4-story blocks on the west side. This new and old mixed-use solution creates a playground core that is not only safe but also acts as a large skylight at the center of the school, promoting natural ventilation across the floors. In these 2 blocks, restrooms, warehouses, and corridors are arranged at the front to isolate direct noise for the classrooms behind, and to gain the disinfection of the restroom while creating a sunshade for the classroom.On a 6540 sqm estimated area, the old building— including a 2-story classroom block with 10 classrooms and some additional functions — was rather dilapidated. It was lacking both teaching and learning facilities, was architecturally monotonous and had a shortage of indoor and outdoor play spaces.The classroom spaces were rearranged, increasing the original size by 1.5 times. They have new optimal ventilation and natural light through the system of windows and the enclosed playground inside. Each classroom is designed as a villa with 3-4 open sides, surrounded by a green garden with natural ventilation, avoiding sunlight and cold wind in winter. Restrooms and balconies are organized in the west to insulate the classroom. Other auxiliary functions are on the 4th floor - the highest floor to prioritize the arrangement of classrooms suitable for preschool psychophysiology on the lower floor.The philosophies of "learning through the exchange," and "encouraging physical activity - play to learn - learn to play" have been conveyed when organizing private playground spaces, appropriate for each activity according to the age, gender, and individual personality of the student. The idea of bringing maximum greenery to the upper floors is seen present on the roof, which creates a fun learning-playing area for students, developing the ecological factor for the project. It also improves the resistance to heat radiation, as well as contributes to adding a space of many ecological trees to the overall landscape of the city. The rooftop garden is expected to be fully self-sufficient with 50-80% of the vegetable requirement for the school itself coming from the site.Text description provided by the architects.Built in a suburban area with a low construction density and population, now in the process of urban exploration and expansion, this 20-year-old school was renovated for people’s needs according to contemporary land use planning standards and new teaching and learning requirements of the inner city.The aim of the design is to ensure the standard of facilities according to the requirements of educational innovation, suitable for the psychophysiology of preschool students, approaching the philosophy of educational innovation, regional and international advanced education. At the same time, it achieved energy-saving values for not only the building itself but also contributed to the surrounding community with economical construction investment costs and a reasonable public investment budget.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data