logo

Dieppe Industrial Park Expansion - Phase 2B

Sector: Airport • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

This project consists of adding road infrastructure to extend Aviation Avenue and provide access to the future industrial park in the City of Dieppe. The project will also install water infrastructure to connect to the City’s water distribution system, in order to adequately supply the industrial park with water. The scope of work for the road infrastructure includes leveling the land at the end o

Project Information FAQ

Project Information

5 Q
The project “Dieppe Industrial Park Expansion - Phase 2B” is an infrastructure initiative in the Airport sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of adding road infrastructure to extend Aviation Avenue and provide access to the future industrial park in the City of Dieppe. The project will also install water infrastructure to connect to the City’s water distribution system, in order to adequately supply the industrial park with water. The scope of work for the road infrastructure includes leveling the land at the end of Aviation Avenue where the road will extend on top of previously installed water and sewer infrastructure, followed by completing the road extension with gravel, asphalt and curb. The road work will cover be approx. 1.5km in length. The scope of work to connect to the aqueduct includes installing a 4.4km long water pipe with a diameter of 350mm that will connect Aviation Avenue to Champlain Street. As much as possible, the pipes will follow existing paths and trails to avoid swamps and wetlands in the area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data