logo
ProjectBid Results

Dietz Stadium EV Charging Station Infrastructure Install

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Installation of a new EV Charging Station for the City of Kingston, at Dietz Stadium

Status
Closed
Sector
Government, Commercial, Stadium, Manufacturing (Industrial), Electric Vehicles (EVs), Automotive, Power Generation (CCGT)
Location
Kingston, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Dietz Stadium EV Charging Station Infrastructure Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dietz Stadium EV Charging Station Infrastructure Install” is an infrastructure initiative in the Government sector, located in Kingston, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of a new EV Charging Station for the City of Kingston, at Dietz Stadium

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Kingston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Stadium, Manufacturing (Industrial), Electric Vehicles (EVs), Automotive, Power Generation (CCGT)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project