Digester Fixed Cover Replacement REBID
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
The work includes: the demolition of the existing concrete dome cover of the fixed cover digester, erection, installation, and testing of a new stainless steel dome cover on the digester, including associated structural, mechanical, electrical and other work as required.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Cement, Steel, Metal
- Location
- Clinton, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Digester Fixed Cover Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: the demolition of the existing concrete dome cover of the fixed cover digester, erection, installation, and testing of a new stainless steel dome cover on the digester, including associated structural, mechanical, electrical and other work as required. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Cement, Steel, Metal |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
