Digester Gas Compressor and Dryer Replacements
Sector: Consumer Products • Location: Fountain Valley, California, United States of America
Source: Dodge USA
This Scope of Work defines the requirements for the work at the Orange County Sanitation Districts Digester Gas Drying Systems, Plant No.1 and Plant No. 2, to replace and rehabilitate the legacy Digester Gas Drying Systems and related appurtenances.
- Status
- Closed
- Sector
- Consumer Products, Waste Processing and Treatment, Government, Oil and Gas, Commercial
- Location
- Fountain Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Digester Gas Compressor and Dryer Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Scope of Work defines the requirements for the work at the Orange County Sanitation Districts Digester Gas Drying Systems, Plant No.1 and Plant No. 2, to replace and rehabilitate the legacy Digester Gas Drying Systems and related appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fountain Valley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Waste Processing and Treatment, Government, Oil and Gas, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
