logo

Digital Connexion 1 GW Data Center in Visakhapatnam

The owner, status and timeline of this project. A free account opens every field.

Source: Rediff MoneyWiz

Project
Planned

Digital Connexion, a joint venture between Reliance Industries, Brookfield and US-based Digital Realty, announced an investment of USD 11 billion by 2030 to build 1 gigawatt of AI-native, purpose-built data centers spanning 400 acres in Visakhapatnam, Andhra Pradesh. The facility is designed to support seamless AI workloads with robust infrastructure and is expected to consume electricity equivale

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
Visakhapatnam, Andhra Pradesh, India
Updated
22 Jul 2026
Source
Rediff MoneyWiz

ConstructChat

Ask ConstructChat about Digital Connexion 1 GW Data Center in Visakhapatnam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Digital Connexion 1 GW Data Center in Visakhapatnam” is an infrastructure initiative in the Data Center sector, located in Visakhapatnam, Andhra Pradesh, India. Taiyo aggregates data on it from Rediff MoneyWiz.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Digital Connexion, a joint venture between Reliance Industries, Brookfield and US-based Digital Realty, announced an investment of USD 11 billion by 2030 to build 1 gigawatt of AI-native, purpose-built data centers spanning 400 acres in Visakhapatnam, Andhra Pradesh. The facility is designed to support seamless AI workloads with robust infrastructure and is expected to consume electricity equivalent to nearly 50% of Mumbai's annual consumption.

Original sector

Digital Infrastructure

Budget

Location

Country

India

State

Andhra Pradesh

City

Visakhapatnam

Source

Source

Rediff MoneyWiz

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2025-11-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project