logo
ProjectPlanned

Digital Gateway Data Center Complex

Sector: Water Supply and Storage • Location: Washington, D.C., Virginia, United States

Source: AOL

Digital Gateway is a planned 22 million square foot data center complex on a rural parcel outside Washington, D.C. The project has faced legal challenges and a Virginia appeals court invalidated a rezoning for the project, potentially scuttling the mega-project. The data center industry is facing growing opposition due to concerns about rising power costs, water usage, environmental impact, and pu

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Data Center, Road
Location
Washington, D.C., Virginia, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Digital Gateway Data Center Complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Digital Gateway Data Center Complex” is an infrastructure initiative in the Water Supply and Storage sector, located in Washington, D.C., Virginia, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Digital Gateway is a planned 22 million square foot data center complex on a rural parcel outside Washington, D.C. The project has faced legal challenges and a Virginia appeals court invalidated a rezoning for the project, potentially scuttling the mega-project. The data center industry is facing growing opposition due to concerns about rising power costs, water usage, environmental impact, and public perception. Industry executives and advocacy groups are calling for a coordinated response to address these issues.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Washington, D.C.

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Data Center, Road

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project