Digital Transformation Technologies and Processes
The status, timeline and source of this project. A free account opens every field.
Source: Grants.gov
The AFMC Digital Campaign is a coordinated effort to move the activities of the Air Force enterprise, government and industry, to modern digital capabilities and processes. The desired end state is a collaborative, integrated digital environment that guides, orchestrates, and delivers the means for each individual across the enterprise to access the data, functions, and elements needed to do his o
- Status
- Closed
- Sector
- Warehouse, Government, Manufacturing (Industrial), Aerospace & Defense, Commercial, Education, Residential
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Digital Transformation Technologies and Processes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The AFMC Digital Campaign is a coordinated effort to move the activities of the Air Force enterprise, government and industry, to modern digital capabilities and processes. The desired end state is a collaborative, integrated digital environment that guides, orchestrates, and delivers the means for each individual across the enterprise to access the data, functions, and elements needed to do his or her job in a purely digital manner. The Air Force seeks a Digital Transformation Technologies and Processes (DTTP) consortium to develop, demonstrate and validate advanced digital engineering and digital manufacturing tools to accelerate their adoption and implementation within the Air Force enterprise and the wider industrial base. Digital Campaign goals to be addressed by a Digital Transformation Technologies and Processes (DTTP) consortium are numerous and include, but are not limited to: early assessments using mission analysis (to explore operational value of proposed materiel solution); shrinking development time to get to production via paperless reviews, acceptance & audits; system modeling which enables operational and system functional insights across acquisition and operations communities; digital thread capability to facilitate the Authoritative Source of Truth data to be used to re-compete work; methods for efficient validation that enterprise or system concepts meet strict surety, safety, security requirements; optimized test throughout the system lifecycle by delivering mature test articles/systems developed through MBE/MBSE practices; enhanced standardization and common interfaces across enterprise which enable alternate solutions, rapid product development, and enhanced manufacturing flexibility; and, model-based capabilities which enhance logistics and maintenance of fielded capabilities. All of these goals (and many others) require a capable consortium that leverages industry knowledge and best practices and provides assessment, development, demonstration, risk reduction, and validation of advanced digital engineering and digital manufacturing tools, concepts, and processes. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Warehouse, Government, Manufacturing (Industrial), Aerospace & Defense, Commercial, Education, Residential |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- Woodridge traffic
- CONSTRUCTION OF NEW 103,406 SQ FT SPECULATIVE WAREHOUSE - INCLUDES LOT MERGER AND DEMO OF ALL (E) STRUCTURES
- NEW 9,870 SQ FT BUILDING FOR WAREHOUSE. "F" OCCUPANCY, TYPE III-B CONSTRUCTION
- ZONING TEXT AMENDMENT TO ALLOW TRUCK TERMINAL IN IP DISTRICT WITH CUP; CUP FOR AMAZON LOGISTICS TRUCK TERMINAL
- SUBDIVISION OF AN (E) WAREHOUSE LEASED SPACE INTO INDIVIDUAL TENANT UNITS USING PRE-FABRICATED PARTITION SYSTEM, SEE TEXT
- CONSTRUCT A 7,844 SQ. FT. ADDITION TO AN EXISTING WAREHOUSE
- TI FOR NON-CONDITIONED SHELL BUILDING 93,515 SQ FT. (3224 OFFICE/90,291 WAREHOUSE)
- SPECULATIVE OFFICE TI BUILDOUT 2,529 SQ FT AND WAREHOUSE LIGHTING (REFER TO SHELL 202105270)
