logo
ProjectEnded

Digitalization and Automation of Freight Rail

Sector: Aerospace & Defense • Location: Germany, Austria, Sweden, Spain, Italy, France, Slovakia

Source: EU Funding & Tenders Portal

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based

Status
Closed
Sector
Aerospace & Defense, Mass Transit, Power Generation (CCGT), Rail, Electric Vehicles (EVs), Automotive
Location
Germany, Austria, Sweden, Spain, Italy, France, Slovakia
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Digitalization and Automation of Freight Rail

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Digitalization and Automation of Freight Rail” is an infrastructure initiative in the Aerospace & Defense sector, located in Germany, Austria, Sweden, Spain, Italy, France, Slovakia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Company

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based Maintenance (CBM) by collecting, transmitting and using the necessary information while being supplied with the required energy by means of an advanced energy management system. Improved methods for annual and short-term timetable planning (3) will help traffic operators increasing the overall capacity and raise punctuality and with Real-time network management (4), integrating medium to short-term and operational planning at yards/terminals and in the railway network, inefficiencies will be further reduced or even eliminated. Future freight wagon design (5) is a stream that will contribute in improving reliability of the freight transport while increasing the payload per meter of train. The latter one will be propelled by future main line electric freight locomotives featuring highly flexible freight propulsion (6) systems with reduced operational costs. Furthermore, these new freight trains will be propelled by more than one locomotive running with distributed power (7), thus allowing long freight trains up to 1,500 m. Last but not least, focus is given to driver advisory aystems that are connected (C-DAS) to the traffic management systems (8), further enhancing capacity, improving punctuality and optimize energy consumption of the railway system. Summarizing, FR8RAIL II focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.

Location

Country

Germany, Austria, Sweden, Spain, Italy, France, Slovakia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Mass Transit, Power Generation (CCGT), Rail, Electric Vehicles (EVs), Automotive

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project