logo

Digitalization and Automation of Freight Rail

Sector: Aerospace & Defense • Location: Germany, Austria, Sweden, Spain, Italy, France, Slovakia

Source: EU Funding & Tenders Portal

Project
Ended

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based

Project Information FAQ

Project Information

4 Q
The project “Digitalization and Automation of Freight Rail” is an infrastructure initiative in the Aerospace & Defense sector, located in Germany, Austria, Sweden, Spain, Italy, France, Slovakia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based Maintenance (CBM) by collecting, transmitting and using the necessary information while being supplied with the required energy by means of an advanced energy management system. Improved methods for annual and short-term timetable planning (3) will help traffic operators increasing the overall capacity and raise punctuality and with Real-time network management (4), integrating medium to short-term and operational planning at yards/terminals and in the railway network, inefficiencies will be further reduced or even eliminated. Future freight wagon design (5) is a stream that will contribute in improving reliability of the freight transport while increasing the payload per meter of train. The latter one will be propelled by future main line electric freight locomotives featuring highly flexible freight propulsion (6) systems with reduced operational costs. Furthermore, these new freight trains will be propelled by more than one locomotive running with distributed power (7), thus allowing long freight trains up to 1,500 m. Last but not least, focus is given to driver advisory aystems that are connected (C-DAS) to the traffic management systems (8), further enhancing capacity, improving punctuality and optimize energy consumption of the railway system. Summarizing, FR8RAIL II focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data