logo

Digitalization Of Critical Components in OFFshore wind turbines

Sector: Seaport • Location: Spain, Belgium

Source: EU Funding & Tenders Portal

Project
Ended

The main objectives of this proposal are to optimize the design, increase the performance rates and reduce the maintenance costs of critical components in offshore wind turbines, through the digitalization of specific critical components. Wind turbine OEMs and some components manufacturers have already started to implement sensors and data collection systems in the wind turbines they are providin

Project Information FAQ

Project Information

3 Q
The project “Digitalization Of Critical Components in OFFshore wind turbines” is an infrastructure initiative in the Seaport sector, located in Spain, Belgium. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objectives of this proposal are to optimize the design, increase the performance rates and reduce the maintenance costs of critical components in offshore wind turbines, through the digitalization of specific critical components. Wind turbine OEMs and some components manufacturers have already started to implement sensors and data collection systems in the wind turbines they are providing and installing. However, efficient proven concepts have not been demonstrated yet, due to two main gaps or challenges to be overcome: - The technological gap: significant technology development and validation is still needed to achieve new products and services ready for commercialization. Sensors and remote monitoring systems are yet to be extensively implemented in offshore energy generation facilities, as they currently provide little information that may be used in advance to any incident. - The data access gap: access to the data collected from the wind energy turbines in operation is limited only to windfarm developers and OEMs. Therefore, most European components suppliers can not obtain, manage, analyze and learn from the performance data produced by their components in real-life operation, missing that way the opportunity to improve their competitiveness and increase the added-value of the products. DOCC-OFF focuses on addressing the technology gap in the pitch system digitalization and the real data availability for a reliable validation and demonstration process. Hence, the main challenge of the project will be to implement, validate and demonstrate sensors, remote monitoring system and big data analytics tools that will allow to obtain data from those critical components and to extract value out of them in order to deliver the defined objectives. The results of the project will have a relevant impact on the improvement of competitiveness of the DOCC-OFF partners, making offshore wind a competitive technology between other power generation alternatives.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data