Dillman Drive Bridge Replacement
Closed · Ohio · Last reported Jan 2025
Source: Dodge
The proposed improvements include replacing the approach slabs and superstructure (deck), along with road repairs, resurfacing, and guardrail improvements near the bridge. Construction is currently scheduled to begin in summer 2025 and last approximately 15 months. Construction Inspection and Construction Administration for the Dillman Drive Bridge Improvement Project in Summit County
- Status
- Closed
- Sector
- Government, Mass Transit, Road, Rail, Commercial, Bridge
- Location
- Hudson, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dillman Drive Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvements include replacing the approach slabs and superstructure (deck), along with road repairs, resurfacing, and guardrail improvements near the bridge. Construction is currently scheduled to begin in summer 2025 and last approximately 15 months. Construction Inspection and Construction Administration for the Dillman Drive Bridge Improvement Project in Summit County |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Hudson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Mass Transit, Road, Rail, Commercial, Bridge |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
