logo
ProjectClosed

Direct Buried Secondary Services Replacement

One of 10,000+ projects Taiyo tracks in Alabama.

Source: Dodge USA

The Work specified for this project consists of installing underground utilities using either a trencher, hand tools, or a directional boring machine. This Work shall include services, equipment, materials, and labor for the complete and proper installation of the specified conduit size and materials at a minimum depth of 36 inches. All work will be replacing the secondary between the transformer

Status
Closed
Sector
Power Transmission, Government, Power Generation (CCGT), Commercial
Location
Dothan, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Direct Buried Secondary Services Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Direct Buried Secondary Services Replacement” is an infrastructure initiative in the Power Transmission sector, located in Dothan, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work specified for this project consists of installing underground utilities using either a trencher, hand tools, or a directional boring machine. This Work shall include services, equipment, materials, and labor for the complete and proper installation of the specified conduit size and materials at a minimum depth of 36 inches. All work will be replacing the secondary between the transformer and the meter base, a junction box and the meter base, or a transformer and a junction box. The D...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Dothan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Government, Power Generation (CCGT), Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project