Direct Connection Project
Sector: Road • Location: Bellmawr, New Jersey, United States
Source: 42 Freeway
The Direct Connection Project in Bellmawr, NJ aims to create a more direct and straighter passageway for Route 295 through the Bellmawr interchange area, including significant upgrades to Route 42 and Interstate 76. The project has faced challenges, including a major roadway collapse in 2021, but is currently progressing with the construction of new walls and bridges.
- Status
- Under Construction
- Sector
- Road
- Location
- Bellmawr, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- 42 Freeway
ConstructChat
Ask ConstructChat about Direct Connection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Direct Connection Project in Bellmawr, NJ aims to create a more direct and straighter passageway for Route 295 through the Bellmawr interchange area, including significant upgrades to Route 42 and Interstate 76. The project has faced challenges, including a major roadway collapse in 2021, but is currently progressing with the construction of new walls and bridges. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Bellmawr |
Source
Source | 42 Freeway |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
