logo
ProjectUnder Construction

Direct Lithium Extraction Technology

The owner, status and timeline of this project. A free account opens every field.

Source: Hart Energy

International Battery Metals Ltd. (IBAT) is utilizing direct lithium extraction (DLE) technology to enhance lithium supplies and reshape mining in the U.S. This cleaner and more efficient process extracts lithium directly from brines, including oilfield brines, and aims to increase domestic production for electric vehicle batteries and renewable energy systems.

Status
Under Construction
Sector
Electric Vehicles (EVs), Energy Storage, Automotive, Power Generation (CCGT)
Location
Salt Lake City, Utah, United States of America
Updated
22 Jul 2026
Source
Hart Energy

ConstructChat

Ask ConstructChat about Direct Lithium Extraction Technology

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Direct Lithium Extraction Technology” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Salt Lake City, Utah, United States. Taiyo aggregates data on it from Hart Energy.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

International Battery Metals Ltd. (IBAT) is utilizing direct lithium extraction (DLE) technology to enhance lithium supplies and reshape mining in the U.S. This cleaner and more efficient process extracts lithium directly from brines, including oilfield brines, and aims to increase domestic production for electric vehicle batteries and renewable energy systems.

Original sector

Energy

Location

Country

United States of America (USA)

State

Utah

City

Salt Lake City

Source

Source

Hart Energy

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Energy Storage, Automotive, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project