logo

Dirok Gas Field, Assam

Sector: Commercial • Location: India

Source: Hydrocarbon Technology

Project
Closed

Dirok gas field is located in block AAP-ON-94/1 B in the Tinsukia District of Assam, India, and lies in close proximity to Digboi.The field is operated by the Hindustan Oil Exploration Company, (26.882%) for joint venture (JV) partners Oil India (44.086%) and the Indian Oil Corporation (29.032%). A production sharing contract for the block was originally signed in June 1998 and followed by the com

Project Information FAQ

Project Information

4 Q
The project “Dirok Gas Field, Assam” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dirok gas field is located in block AAP-ON-94/1 B in the Tinsukia District of Assam, India, and lies in close proximity to Digboi.The field is operated by the Hindustan Oil Exploration Company, (26.882%) for joint venture (JV) partners Oil India (44.086%) and the Indian Oil Corporation (29.032%). A production sharing contract for the block was originally signed in June 1998 and followed by the commercial approval of the Dirok discovery within the block by the Ministry of Petroleum and Natural Gas. Production from the gas field began in August 2017. The Rs3.25bn ($54m) development encompasses the drilling of wells, as well as installation of gas processing infrastructure and transport facilities. An additional $66,825 will be required to implement the environmental management plan. The gas field is estimated to hold 11.88 million metric barrels of oil equivalent (mmboe) in proven and probable reserves as of March 2016. The field is situated in the Assam-Arakan basin within the Schuppen thrust belt and covers approximately 350km². It is located near Digboi, Tinsukia, Margherita, Doom Dooma and Makum. The field comprises the Naga, Margherita and Disang thrust zones and is composed of weathered sediment of sandstone. It also includes stones of the Pliocene to Pleistocene ages, as well as a Surma group of rock sandstone, siltstone and mudstone of early to middle Miocene. Exploration activity in the block started in November 2000, leading to the acquisition of 2D/3D seismic data in 2003. The Dirok field was discovered by drilling three exploratory and two appraisal wells, which confirmed the presence of multiple gas-bearing sands. The field development plan includes bringing the three existing wells (Dirok-1, Dirok-2 and Dirok-4) on stream, as well as drilling three new development and producer wells for hydrocarbons production. A new gas-gathering station was set up and a modular gas processing plant with a capacity of 20mmscfd of natural gas is also being set up as part of the proposed initiative. The pipeline installation comprises two parallel gas pipelines and a single gas pipeline. The gas processing plant is being set up in Golai, Bhorpowai, near Digboi, which will process the gas and condensate produced from Dirok field gas wells. New and existing wells and the gas-gathering station are located 25km away from Digboi in the Dirok tea estate under Kumarpatty Panchayat. The gas-gathering station covers approximately 0.6ha of land. It includes a civil foundation, manifolds, flow line and valve network. A fire water tank is also located onsite, along with a fire pump. The field is estimated produce 10 million standard cubic feet of gas per day (million standard cubic feet a day (Mmscfd)) of gas and 120-140 barrels of oil a day from Dirok-1, 2 and 4 wells during the initial production phase (Phase-I). The second stage (Phase-II) of development, involving the commissioning of the modular gas processing plant and pipeline, will increase the production to 35Mmscfd of gas and 800 barrels of oil a day. The processing plant is being constructed on 6ha of agricultural land in the Golai village and is located 16km from the gathering station. It will include a control room, administration buildings and warehouse, as well as manifolds, vessels, tanks, piping and associated valves. Mechanical structural work and instrumentation are also included as part of the processing plant. Machinery at the plant includes a scraper receiver, a test separator, an inlet separator and filters. Other installed equipment include heaters, a concealed ground flaring system, metering arrangement and effluent treatment plant, in addition to supervisory control and data acquisition (SCADA), generators and fire detection system. A pair of 16km-long pipelines supplies the gas from the gathering station to the processing plant, while a 9km pipeline connects the processing plant to the off-take location in Kusijan for the sale of processed gas. The two pipelines, running between the gathering station and the processing plant, comprise a high-pressure and a low-pressure pipeline with a diameter of 8in. The pipelines were installed parallel to each other at a depth of 1m. The pipeline connecting to the buyer’s off-take location lies parallel to the Margherita-Deomali Road. L&T Valves was selected to provide the high-integrity pressure protection system (HIPPS) for the field development. The product is the first to be developed in India. A $30m contract was awarded to Expro to provide the design, engineering, construction, transportation, installation and commissioning of a modular gas processing plant. A team to operate and maintain the plant will also be provided by Expro. The field’s environmental impact assessment was performed by SENES.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data