Disaster Hazard Mitigation Project
One of 3,141 projects Taiyo tracks in Kyrgyz Republic.
Source: World Bank
The Disaster Hazard Mitigation Project for the Kyrgyz Republic aims to: (a) minimize the exposure of humans, livestock, and riverine flora and fauna to radionuclides associated with abandoned uranium mine tailings and waste rock dumps in the Mailuu-Suu area; (b) improve the effectiveness of emergency management and response by national and sub-national authorities and local communities to disaster
- Status
- Closed
- Sector
- Water Supply and Storage, Nuclear, Commercial, Raw Materials, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Disaster Hazard Mitigation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Disaster Hazard Mitigation Project for the Kyrgyz Republic aims to: (a) minimize the exposure of humans, livestock, and riverine flora and fauna to radionuclides associated with abandoned uranium mine tailings and waste rock dumps in the Mailuu-Suu area; (b) improve the effectiveness of emergency management and response by national and sub-national authorities and local communities to disaster situations; and (c) reduce the loss of life and property in key landslide areas of the country. There are three project components. Component 1, Uranium Mining Wastes Isolation and Protection, finances interventions in the Mailuu-Suu area to increase the condition of abandoned uranium tailings and waste dumps, and decrease the instability of large landslide areas. Component 2, Disaster Preparedness and Monitoring, (1) carries out a program of capacity building to improve the national system for disaster management, preparedness and response that can be administered effectively by national and sub-national authorities, as well as local communities; (2) establishes real-time monitoring and warning systems at about major landslides areas to detect and warn against active landslide movements and establish seismic stations and sensors to detect and warn against seismic events in key hazard areas; and establish a comprehensive monitoring system in Mailuu-Suu. Component 3 supports project management. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Nuclear, Commercial, Raw Materials, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kyrgyz Republic
- IWS Smart Farm
- Myrzaki-Kurshab water extension
- Chui Water Resource Efficiency
- City of Osh water utility joint venture
- Building Capacity for the Formation and Management of Water Users Associations
- KWRF - Naryn Water Sub-Project Extension II
- Kok-Dzhangak water
- Additional Financing for the Multisector Activities Support Facility 2025–2030
