Disposal of Toxic Waste from Union Carbide Factory
Under construction · Madhya Pradesh · Last reported Jan 2025
Source: Business Standard
The project involves the disposal of approximately 377 tons of hazardous waste from the defunct Union Carbide factory in Bhopal, which began on January 1, 2025. The waste is being transported in sealed container trucks to a disposal site in Pithampur, Dhar district, following a directive from the Madhya Pradesh High Court.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial)
- Location
- Bhopal, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about Disposal of Toxic Waste from Union Carbide Factory
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the disposal of approximately 377 tons of hazardous waste from the defunct Union Carbide factory in Bhopal, which began on January 1, 2025. The waste is being transported in sealed container trucks to a disposal site in Pithampur, Dhar district, following a directive from the Madhya Pradesh High Court. |
Original sector | Environmental Management |
Location
Country | India |
State | Madhya Pradesh |
City | Bhopal |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial) |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
