DISTRIBUTION SYSTEM AND ENERGY EFFICIENCY
Sector: Power Generation (CCGT) • Location: Thailand
Source: World Bank Group
The main objectives of the project are: (a) to improve and expand the distribution system of the Metropolitan Electricity Authority (MEA) in order to meet the expected rapid increase in demand; (b) to sustain the efficiency of MEA's operations in the face of a rapid increase in the scope and complexity of its business; (c) to strengthen the utility's financial and management information systems; (
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DISTRIBUTION SYSTEM AND ENERGY EFFICIENCY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the project are: (a) to improve and expand the distribution system of the Metropolitan Electricity Authority (MEA) in order to meet the expected rapid increase in demand; (b) to sustain the efficiency of MEA's operations in the face of a rapid increase in the scope and complexity of its business; (c) to strengthen the utility's financial and management information systems; (d) to investigate opportunities for privatization of some of MEA's activities; (e) to incorporate increased levels of safety and environmental acceptability in the utility's design and operation practices; and (f) to introduce demand-side management including the promotion of electricity energy efficiency in the Thai power sector. The project has two major components. The first one, distribution system improvement and expansion, comprises: (a) construction of subtransmission and distribution facilities; and (b) consulting studies regarding: (i) formulation of strategies for privatization of some of MEA's activities, (ii) design and implementation of subsystems in the integrated financial and management information system; and (iii) environmental and safety considerations in system design. The second component, promotion of electricity energy efficiency, includes the Five Year Demand Side Management Master Plan. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
