Distribution System Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Installation of approximately 48,600 of water mains throughout City of Leadwood, including, water meters, valves, hydrants, fittings, SCADA and all other necessary appurtenances per design plans and drawings to make the system complete and operational. Street paving replacement required where water mains require excavation within city roads.
- Status
- Prospective
- Sector
- Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Leadwood, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Distribution System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 48,600 of water mains throughout City of Leadwood, including, water meters, valves, hydrants, fittings, SCADA and all other necessary appurtenances per design plans and drawings to make the system complete and operational. Street paving replacement required where water mains require excavation within city roads. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Leadwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
