logo

Distribution System Strengthening with special focus on foothill SEZs

Sector: Manufacturing (Industrial) • Location: Dimapur, Nagaland, India

Source: India Investment Grid (IIG)

Project
Idea Stage

Information Department of Power, Government of Nagaland has come up with Distribution System Strengthening with special focus on foothill SEZs with a ticket size of 467.26 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Idea Stage and is being developed through the EPC route. Economic/Social Impact of the Project The project is to enha

Project Information FAQ

Project Information

5 Q
The project “Distribution System Strengthening with special focus on foothill SEZs” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Dimapur, Nagaland, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

idea stage

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Department of Power, Government of Nagaland has come up with Distribution System Strengthening with special focus on foothill SEZs with a ticket size of 467.26 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Idea Stage and is being developed through the EPC route. Economic/Social Impact of the Project The project is to enhance the distribution capacity to 260MVA in the Industrial foothill area, and to support the NE Economic Corridor, to achieve load shedding free status, to achieve a high degree of system reliability and availability and to systematically reduce AT&C losses to a commercially viable level. The construction of 30 Nos. of 33/11kV Sub-stations and increasing the capacity of the system to 260 MVA to cater to the demand in the Industrial foothill area, and to support the NE Economic Corridor and and for Augmentation of existing DT capacity in those critical areas by 190 MVA. The project shall strengthen and augment distribution networks and distribution transformers to cater to the power requirements in the commercial foothill area where there is a huge critical gap between demand-supply capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data