Distribution System Strengthening with special focus on foothill SEZs
Sector: Manufacturing (Industrial) • Location: Dimapur, Nagaland, India
Source: India Investment Grid (IIG)
Information Department of Power, Government of Nagaland has come up with Distribution System Strengthening with special focus on foothill SEZs with a ticket size of 467.26 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Idea Stage and is being developed through the EPC route. Economic/Social Impact of the Project The project is to enha
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | idea stage |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Department of Power, Government of Nagaland has come up with Distribution System Strengthening with special focus on foothill SEZs with a ticket size of 467.26 INR Crores. This project in Electricity Distribution sub-sector involves The current status of the project is Idea Stage and is being developed through the EPC route. Economic/Social Impact of the Project The project is to enhance the distribution capacity to 260MVA in the Industrial foothill area, and to support the NE Economic Corridor, to achieve load shedding free status, to achieve a high degree of system reliability and availability and to systematically reduce AT&C losses to a commercially viable level. The construction of 30 Nos. of 33/11kV Sub-stations and increasing the capacity of the system to 260 MVA to cater to the demand in the Industrial foothill area, and to support the NE Economic Corridor and and for Augmentation of existing DT capacity in those critical areas by 190 MVA. The project shall strengthen and augment distribution networks and distribution transformers to cater to the power requirements in the commercial foothill area where there is a huge critical gap between demand-supply capacity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
