Distribution System Telemetry Improvements
Sector: Water Supply and Storage • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The water distribution system is operated with a telemetry system that signals real-time pressure readings at critical nodes in the water distribution system as well as water levels in remote water storage tanks to allow for effective operation, assessment, and control of the system. These signals are relayed to the centralized water delivery control center at the Hemphill Water Treatment Plant. T
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | on-hold / planning |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The water distribution system is operated with a telemetry system that signals real-time pressure readings at critical nodes in the water distribution system as well as water levels in remote water storage tanks to allow for effective operation, assessment, and control of the system. These signals are relayed to the centralized water delivery control center at the Hemphill Water Treatment Plant. The City regularly reviews and updates the telemetry network as required to ensure optimal water distribution system coverage. The scope of this project includes: Installing telemetry transmitters at various locations throughout the water distribution network |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America (USA)
- CNG Fueling at Hamilton Bus Facility
- Industrial wastewater treatment plant
- US 271 from FM 16 North to the Upshur County Line
- Memorial Drive from BW 8 to Tallowood Road
- SH 105 - I-45 to North Frazier Street -SH 75
- Water Treatment Plants Marana Water Treatment Campuses
- Chicago Riverwalk
- Pierce County Sewer and Traffic Operations Facility
