District 175 Groundwater Facility Improvements Package 2
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
Replace two pumps, install new booster pump. Paint interior walls and doors. Replace above ground piping, valves, and flowmeters. Rehabilitate interior ceiling of pump station and concrete pads. Replace louvers, fans. Electrical work
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about District 175 Groundwater Facility Improvements Package 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace two pumps, install new booster pump. Paint interior walls and doors. Replace above ground piping, valves, and flowmeters. Rehabilitate interior ceiling of pump station and concrete pads. Replace louvers, fans. Electrical work |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
