District 32 Main Trunk Sewer Rehabilitation
Sector: Cement • Location: Pico Rivera, California, United States of America
Source: Dodge USA
The project will rehabilitate approximately 15,341 feet of existing corroded 15-inch through 21-inch diameter non-reinforced concrete pipe (NRCP) on the District 32 Main Trunk Sewer with cured-in-place pipe liner and 46 manholes with a protective coating system and all appurtenant work.
- Status
- Closed
- Sector
- Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Pico Rivera, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about District 32 Main Trunk Sewer Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate approximately 15,341 feet of existing corroded 15-inch through 21-inch diameter non-reinforced concrete pipe (NRCP) on the District 32 Main Trunk Sewer with cured-in-place pipe liner and 46 manholes with a protective coating system and all appurtenant work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pico Rivera |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
