District Campus Phase 2 Plant Operations
Closed · California · Last reported Oct 2024
Source: Dodge USA
This project consists of (4) new buildings and required sitework. Additional structures include a premanufactured carport, and pre-manufactured solar canopy. The project scope includes necessary site work improvements of approximately 5.08 acres and supporting utility infrastructure for the construction of the new buildings. The Building A will consist of two-story, type V-B, pre-manufactured meta
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Power Transmission, Education, Solar, Metal, Government, Residential, Power Generation (CCGT)
- Location
- Clovis, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about District Campus Phase 2 Plant Operations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of (4) new buildings and required sitework. Additional structures include a premanufactured carport, and pre-manufactured solar canopy. The project scope includes necessary site work improvements of approximately 5.08 acres and supporting utility infrastructure for the construction of the new buildings. The Building A will consist of two-story, type V-B, pre-manufactured metal building of approximately 12,890 s.f. The shop buildings will consist of one-story, type V-B pr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Clovis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Power Transmission, Education, Solar, Metal, Government, Residential, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
