logo
ProjectClosed

District Energy System Expansion Phase 10

Closed · British Columbia · Last reported Sep 2025

Source: Dodge

Construction of district energy systems including: Supply and installation of pre-insulated steel pipe, leak detection systems and communication conduits, Testing and commissioning, and Restoration works for roadways, landscaping, and sites. The contract involves work at 6 different sites, namely: Site#1 Centro, Site#2 Sync 134 Apartments and 6 Inch Connection at 134A St. (E20624) o 307m of 200 mm

Status
Closed
Sector
Government, Steel, Commercial, Residential, Metal
Location
Surrey, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about District Energy System Expansion Phase 10

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “District Energy System Expansion Phase 10” is an infrastructure initiative in the Government sector, located in Surrey, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of district energy systems including: Supply and installation of pre-insulated steel pipe, leak detection systems and communication conduits, Testing and commissioning, and Restoration works for roadways, landscaping, and sites. The contract involves work at 6 different sites, namely: Site#1 Centro, Site#2 Sync 134 Apartments and 6 Inch Connection at 134A St. (E20624) o 307m of 200 mm trenched DES piping and appurtenances, o 36m of 80 mm trenched DES piping and appurtenances, o 1...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Surrey

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Steel, Commercial, Residential, Metal

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project