logo

District heating Bayannaoer

Sector: Geothermal • Location: China

Source: KFW Bank aus Verantwortung

Project
Active

By using the FZ funding loan of EUR 60 million, the existing district heating network of the city of Bayannaoer is to be modernized and expanded in order to supply a heating area of a total of 13.3 million m² with heating heat in the Linhe district. As part of the project, a total of 156 heat exchangers and around 72 km of primary pipelines are to be newly installed and around 238 km of existing s

Project Information FAQ

Project Information

5 Q
The project “District heating Bayannaoer” is an infrastructure initiative in the Geothermal sector, located in China. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

By using the FZ funding loan of EUR 60 million, the existing district heating network of the city of Bayannaoer is to be modernized and expanded in order to supply a heating area of a total of 13.3 million m² with heating heat in the Linhe district. As part of the project, a total of 156 heat exchangers and around 72 km of primary pipelines are to be newly installed and around 238 km of existing secondary pipelines are to be rehabilitated. The project measures also include the construction of a geothermal heat generation plant, which will be equipped with a 1.5 MW photovoltaic system to cover the company's own electricity needs. A coal-fired thermal power plant (available output 516 MWth) with combined heat and power generation, completed in 2014, will be used to cover the additional heat energy requirements. By using a central heat source and developing renewable energies, a total of 98 coal-fired, inefficient, decentralized boilers will be switched off. Consequently, the objective of the measure is to achieve a more energy-efficient and environmentally friendly district heating supply in Bayannaoer in order to achieve significant savings in greenhouse gas emissions. The target group of the project is the population in Bayannaoer supplied by the district heating system, who will benefit from a more efficient and environmentally friendly heat supply.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data