District Heating Project
One of 4,952 projects Taiyo tracks in Bulgaria.
Source: World Bank Group
The District Heating Project for Bulgaria aims to assist the Sofia and Pernik District Heating Companies (DHC) to: (i) improve the quality of their services; (ii) improve their financial viability; and (iii) increase environmentally friendly operations through energy conservation and pollution reduction measures. There are two project components comprising several sub-components. Component 1 a) re
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Geothermal, Government
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about District Heating Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The District Heating Project for Bulgaria aims to assist the Sofia and Pernik District Heating Companies (DHC) to: (i) improve the quality of their services; (ii) improve their financial viability; and (iii) increase environmentally friendly operations through energy conservation and pollution reduction measures. There are two project components comprising several sub-components. Component 1 a) rehabilitates the heat transmission and distribution network by installing pre-insulated pipes, modern ball and butterfly valves, compensators, and thermal insulation; b) assembles and installs 1, 097 sub-stations; and c) provides technical assistance through Sofia private sector participation consulting services, consultants that update a financial management system, and consultants who will launch a public awareness campaign, and it supports additional designs and supervision, auditing costs, and incremental operating costs. Component 2 a) supports the cost of assembling 700 sub-stations and helps purchase additional components like heat exchangers and pumps for the sub-stations; b) finances the replacement of heat transmission pipes with pre-insulated pipes and supports the purchase of variable speed pumps and monitoring systems for the district heating network; c) supports the replacement of an old and outdated electrostatic precipitator for a boiler in the lignite fired Combined Heat and Power (CHP) plant; and d) provides technical assistance for a public awareness campaign, and design and supervision, as well as funding auditing costs, incremental operating costs, and maintenance of the financial management system. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Bulgaria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
