logo
ProjectClosed

District Heating Project

One of 4,952 projects Taiyo tracks in Bulgaria.

Source: World Bank Group

The District Heating Project for Bulgaria aims to assist the Sofia and Pernik District Heating Companies (DHC) to: (i) improve the quality of their services; (ii) improve their financial viability; and (iii) increase environmentally friendly operations through energy conservation and pollution reduction measures. There are two project components comprising several sub-components. Component 1 a) re

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Geothermal, Government
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about District Heating Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “District Heating Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The District Heating Project for Bulgaria aims to assist the Sofia and Pernik District Heating Companies (DHC) to: (i) improve the quality of their services; (ii) improve their financial viability; and (iii) increase environmentally friendly operations through energy conservation and pollution reduction measures. There are two project components comprising several sub-components. Component 1 a) rehabilitates the heat transmission and distribution network by installing pre-insulated pipes, modern ball and butterfly valves, compensators, and thermal insulation; b) assembles and installs 1, 097 sub-stations; and c) provides technical assistance through Sofia private sector participation consulting services, consultants that update a financial management system, and consultants who will launch a public awareness campaign, and it supports additional designs and supervision, auditing costs, and incremental operating costs. Component 2 a) supports the cost of assembling 700 sub-stations and helps purchase additional components like heat exchangers and pumps for the sub-stations; b) finances the replacement of heat transmission pipes with pre-insulated pipes and supports the purchase of variable speed pumps and monitoring systems for the district heating network; c) supports the replacement of an old and outdated electrostatic precipitator for a boiler in the lignite fired Combined Heat and Power (CHP) plant; and d) provides technical assistance for a public awareness campaign, and design and supervision, as well as funding auditing costs, incremental operating costs, and maintenance of the financial management system.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project